News Updates
  • Sharjah Municipality Launches Mosquito Control Campaign After Recent Rainfall
  • Sharjah City Municipality tightens control over barber shops and beauty centers
  • SCM and Investment Bank distribute 610 Daily Meals to Civic Workers Throughout Ramadan
  • SCM Gears Up for Ramadan with intensified inspection campaigns
  • Sharjah Municipality starts issuing permits for food outlets to display and sell in Ramadan daytime
  • Sharjah City Municipality and Alif Group Join Forces to Regulate Parking and Residences in Al Mamsha and Zero 6 mall
  • Sharjah Municipality Starts Evaluation Process for Best Garden Award Entrants
  • Sharjah Municipality showcases innovative projects during participation in UAE Innovation Month activities
  • Sharjah City Municipality: 300 Team Leaders, Supervisors, and 375 Support Staff Deployed to Effectively Deal with Unstable Weather Conditions
  • Sharjah Municipality launches 17th Edition of its Best Home Garden Award

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Approval Engineering Drawings
  • Service Description
    • A service that enables engineering consultancy offices to submit a request for auditing plans for the purpose of "plan approval" for new projects, modification projects and expansion projects. It also enables them to follow up the status of the request, modify the request, receive engineers ’notes, receive the approved plans, and a certificate of approval of the plans.
  • Service Execution Steps
    • Service Channel:

      • Sharjah City Municipality website / Our electronic and smart services / Building Permits Administration Services / Plans Approval Service.
      • Service delivery times:  (24 hours, seven days a week).

      Service delivery procedure:

      • Log in to the service using the user account (an engineering consultancy office accredited by the Sharjah Municipality).
      • Enter all required data into the system.
      • Attach all required documents to the system.
      • Agree to the terms and conditions.

      Pay the fees. (In new projects, fees are calculated by the consultant through the system, in modifition and expansion projects, fees and violations are calculated by the engineers of the Sharjah Municipality).


       

  • After Service Steps
    • New projects:

      • After submitting the application, the consultant must follow up on the status of the application through the user account on the website of the Sharjah City Municipality
      • The Building Permits Services Section checks the required documents. If there are missing documents, the application will be rejected and the application will be returned via the system to the user's account (consultant).
      • In case the request is rejected, the consultant must modify the request.
      • If the documents are complete, the engineers 'notes will be uploaded on the plans through the system. The response of the engineer will depend on the daily work schedule.
      • The consultant must update the application and re-attach the modified plans according to the engineers' notes.
      • Once the engineers 'notes are completed, the approved plans and the approval certificate will be sent over the system to the user's account (consultant).

      Modified or Expanded Projects:

      • After submitting the application, the consultant must follow up on the status of the application through the user account on the website of the Sharjah City Municipality
      • The Building Permits Services Section checks the required documents. If there are missing documents, the application will be rejected and the application will be returned via the system to the user's account (consultant).
      • In case the request is rejected, the consultant must modify the request.
      • If the documents are complete, the fees and fines will be calculated by the engineers of the Sharjah City Municipality and the payment link will be sent to the consultant.
      • After paying the fees, the consultant must update the application. the engineers 'notes will be uploaded on the plans through the system. The response of the engineer will depend on the daily work schedule.

      Once the engineers 'notes are completed, the approved plans and the approval certificate will be sent over the system to the user's account (consultant).


       

  • Support Documents
      • Elevator system requirements
      • Material guarantees
      • Required Documents
      • Competency Index Model
      • Fee calculation method
      • إقرار الإرتدادات
      • تعهد السياج والميول
      • تعهد تصحيح المخالفات
      • إقرار بأعمال حفر مفتوح
      • نموذج إقرار السلامة الإنشائية للمبنى القائم
      • نموذج تعهد للبلاطات المعدنية
      • نموذج تعهد للبلاطات لاحقة الشد
      • قائمة تدقيق المخططات الصحية
      • القواعد الإرشادية الصحي
      • قائمة التدقيق المعمارية
      • القواعد الإرشادية المعمارية
      • قائمة التدقيق الإنشائي
      • نموذج تعهد بفضاء و خلو ارض الجار
      • نموذج تعهد بموافقة هيئة طرق و مواصلات الشارقة
  • Terms & Conditions
    • Print

      General Terms and Conditions for the Acceptance of the Electronic Service:

       

      1. The information entered in the fees calculation screen is correct.

      2. Ensure that the submitted plans match the plans issued by the relevant official authorities.

      3. The obligation to inform the owner of the standard contract form issued by the Sharjah City Municipality.

      4. Commitment to all requirements of the UAE elevator control system, if any.

      5. Commitment to hand over all original guarantees issued by suppliers regarding the materials used in the project to the owner.

      6. Ensuring all kinds of insulation works through supervision and follow-up.​

      I, as the provider of the transaction (Engineering Consulting Office), acknowledge my full responsibility for fulfilling the condition mentioned above and that I bear all the consequences decided by the municipality in case of violation.


       

logo
Approval Engineering Drawings اعتماد المخططات الهندسية
Terms and Conditions الشروط والأحكام

General Terms and Conditions for the Acceptance of the Electronic Service:

 

1. The information entered in the fees calculation screen is correct.

2. Ensure that the submitted plans match the plans issued by the relevant official authorities.

3. The obligation to inform the owner of the standard contract form issued by the Sharjah City Municipality.

4. Commitment to all requirements of the UAE elevator control system, if any.

5. Commitment to hand over all original guarantees issued by suppliers regarding the materials used in the project to the owner.

6. Ensuring all kinds of insulation works through supervision and follow-up.​

I, as the provider of the transaction (Engineering Consulting Office), acknowledge my full responsibility for fulfilling the condition mentioned above and that I bear all the consequences decided by the municipality in case of violation.


 

​​

الضوابط التي تحكم قبول معاملة اعتماد المخططات إلكترونيا:

 

  1. صحة المعلومات المدخلة بشاشة حساب الرسوم.
  2. ضمان مطابقة المخططات المقدمة مع المخططات الصادرة عن الجهات الرسمية المعنية ذات الصلة.
  3. الالتزام بإطلاع المالك على نموذج العقد الموحد الصادر عن بلدية مدينة الشارقة.
  4. الالتزام بكافة متطلبات النظام الإماراتي للرقابة على المصاعد حال وجودها.
  5. الالتزام بتسليم كافة الضمانات الأصلية الصادرة عن الموردين بخصوص المواد المستخدمة في المشروع للمالك.
  6. ضمان أعمال العزل بأنواعه من خلال الإشراف والمتابعة.

 

إقر أنا مقدم المعاملة بصفتي (مكتب استشارات هندسية)  بمسؤوليتي الكاملة عن استيفاء الضوابط وفق ما تقدم وبتحملي كافة التبعات التي

تقررها البلدية حال مخالفتها.


 

​​​