News Updates
  • Parking spaces in Muwaileh commercial area in Sharjah become pre-paid public parking
  • Sharjah Municipality marks International Mother Language Day
  • SCM rates performance of consultants and contractors with star classification app
  • Third Sharjah Food Safety Forum Takes Place Tomorrow
  • Sharjah Municipality supports youth entrepreneurs by inaugurating mobile food truck court
  • Special Seats Allocated for Seniors at Sharjah Parks
  • SCM Completes Exploration Phase of Digital Transformation Program
  • SCM continues digital transformation with Sabeq program
  • SCM Launches Implementation Phase 1 of Sabeq Digital Transformation
  • SCM discusses best food safety practices in 3rd Food Safety Forum

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Permit for night-time concrete casting
  • Service Description
    • The contractor of the project submits a request for a permit for night-time concrete casting in a commercial or industrial area. This permit is required for pouring the raft slab or roof only from 10 p.m. to 6 a.m.
  • Service Execution Steps
      1. Obtaining all required documents to be presented at the site, as set out in the terms and conditions. 
      2. Entering the required details. 
      3. Uploading the Public Parking Department's approval certificate.
      4. Agreeing to the casting of raft slab or roof only. Agreeing on the undertaking and conditions.
      5. Paying the permit fees.
      6. Issuing the permit online.
      7. For assistance or enquiry, call the Engineering Department on: 065160202
  • After Service Steps
    • ​​The municipal inspection and control department inspects the construction sites during the casting of concrete at night.

  • Support Documents
  • Terms & Conditions
    • Print
      1. A valid approval from Sharjah police. 
      2. A valid approval from Sharjah RTA. 
      3. 3. A valid approval from Sharjah Municipality's Public Parking Department (If the construction site overlooks asphalt roads).
      4. The project must be belong to the user (i.e. the contractor). 
      5. Project status: Initial or Existing. Project area: commercial or industrial area. 
      6. Permit allows work from 10 p.m. to 6 a.m. 
      7. Permit is used for casting the following elements: raft slab or roof only. 
      8. Permit is valid for the concrete casting day, which is mentioned in the permit, for one time only. 
      9. All labour laws must be complied with before casting of concrete.​

      Documents required before e-transaction submission, and to be kept at the site.

      1. A valid approval from Sharjah police.
      2. A valid approval from Sharjah RTA.
      3. 3. A valid approval from Sharjah Municipality's Public Parking Department (If the construction site overlooks asphalt roads) or Letter of pledge stating that the building under construction is located in a dirt area (away from the asphalt roads).
logo
Permit for night-time concrete casting تصريح صب خرسانة ليلي
Terms and Conditions الشروط والأحكام
  1. A valid approval from Sharjah police. 
  2. A valid approval from Sharjah RTA. 
  3. 3. A valid approval from Sharjah Municipality's Public Parking Department (If the construction site overlooks asphalt roads).
  4. The project must be belong to the user (i.e. the contractor). 
  5. Project status: Initial or Existing. Project area: commercial or industrial area. 
  6. Permit allows work from 10 p.m. to 6 a.m. 
  7. Permit is used for casting the following elements: raft slab or roof only. 
  8. Permit is valid for the concrete casting day, which is mentioned in the permit, for one time only. 
  9. All labour laws must be complied with before casting of concrete.​

Documents required before e-transaction submission, and to be kept at the site.

  1. A valid approval from Sharjah police.
  2. A valid approval from Sharjah RTA.
  3. 3. A valid approval from Sharjah Municipality's Public Parking Department (If the construction site overlooks asphalt roads) or Letter of pledge stating that the building under construction is located in a dirt area (away from the asphalt roads).
  1. موافقة شرطة الشارقة سارية المفعول 
  2. موافقة هيئة الطرق و المواصلات فى الشارقة سارية المفعول
  3. 3. موافقة إدارة المواقف العامة فى بلدية مدينة الشارقة سارية المفعول (فى حال يطل الموقع الإنشائي على طرق أسفلتية)
  4. المشروع عائد للمستخدم : المقاول
  5. حالة المشروع : مبدئي أو قائم
  6. منطقة المشروع : تجاري او صناعي
  7. التصريح صالح من الساعة العاشرة الساعة السادسة صباحا.
  8. التصريح صالح لصب العناصر التالية : الحصيرة المسلحة او الاسقف فقط.
  9. التصريح صالخ فقط ليوم صب الخرسانة المدون فى التصريح مرة واحدة.
  10. وجوب مراعاة قوانين العمل قبل الصب

المستندات المطلوبة قبل تقديم المعاملة الإلكترونية ، ويتم الاحتفاظ بها في الموقع لتقديمها عند اللزوم

  1. موافقة شرطة الشارقة سارية المفعول
  2. موافقة هيئة الطرق و المواصلات فى الشارقة سارية المفعول
  3. 3. موافقة إدارة المواقف العامة فى بلدية مدينة الشارقة سارية المفعول (فى حال يطل الموقع الإنشائي على طرق أسفلتية) او رسالة تعهد يفيد بأن المبنى قيد الإنشاء يقع في منطقة ترابية (بعيداً عن الطرق الإسفلتية)

​​​