News Updates
  • Sharjah Municipal Council and Municipality Launch “Youth, Sustainable Future” Program to Support Youth
  • Sharjah Municipality Unveils Advanced Al-SAD 1500 Emergency Pumps to Enhance Emergency Preparedness
  • Sharjah Municipality Regulates City Centre Al Zahia Parking to Ensure a Smoother Visitor Experience Under New Cooperation Agreement
  • Sharjah Municipality Trains 23 Employees as Certified ISO Internal Auditors through Intensive Program
  • Sharjah Municipality Busts Arab Fraudster Selling Tank Water as Zamzam
  • SCM Conducts 12,000 Food Establishment Inspections, Closes Two Warehouses for Violations
  • Sharjah City Municipal Council and Municipality Welcome Chinese Delegation to Strengthen Cooperation and Exchange Expertise
  • Sharjah Municipality Launches Online Sewerage Information Request Service
  • Sharjah Municipal Council and Municipality Honour Former Rental Disputes Committee Members
  • Committee on Agricultural Violations Intensifies Oversight to Ensure Proper Use of Farms

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Request for Inspection report for the consultant scheme to match the reality of the under construction buildings
  • Service Description
    • Request for Inspection report for the consultant scheme to match the reality of the under construction buildings
  • Service Execution Steps
  • After Service Steps
    • ​- The municipality’s engineer calls the consultant to set an appointment.
      - After audit, the municipality’s engineer delivers the report at the site.​

       
  • Support Documents
  • Terms & Conditions
    • Print

      Requirements:

      - Project must be belonged to the user: consultant only.
      - Site under construction (no completion certificate issued for the project.)
      - Consultant’s valid license.
      - No outstanding violations on the consultant.
      - No outstanding violations on the plot.

       

      documents required during inspection:
      - Copy of plot plan
      - The consultant’s plans, sealed by the Building Control Section, to match them with the reality of buildings under construction.​
logo
Request for Inspection report for the consultant scheme to match the reality of the under construction buildings تقرير تفتيش على مخططات الاستشاري لمطابقتها بالواقع للمباني قيد الإنشاء
Terms and Conditions الشروط والأحكام

Requirements:

- Project must be belonged to the user: consultant only.
- Site under construction (no completion certificate issued for the project.)
- Consultant’s valid license.
- No outstanding violations on the consultant.
- No outstanding violations on the plot.

 

documents required during inspection:
- Copy of plot plan
- The consultant’s plans, sealed by the Building Control Section, to match them with the reality of buildings under construction.​

الاشتراطات:

- المشروع عائد للمستخدم : الاستشاري فقط.
- موقع قيد الانشاء (لا يوجد شهادة انجاز للمشروع)
- رخصة الاستشارى سارية المفعول
- لا يوجد مخالفات على رخصة الاستشاري
- عدم وجود مخالفات على قطعة الارض
 
الوثائق المطلوبة بالموقع اثناء التفتيش:
- صورة خارطة الارض. 
- مخططات الاستشاري لمطابقتها بالواقع للمباني قيد الانشــاء  عليها ختم قسم الرقابة على المباني.​

​​​​