News Updates
  • Sharjah Municipality Launches Mosquito Control Campaign After Recent Rainfall
  • Sharjah City Municipality tightens control over barber shops and beauty centers
  • SCM and Investment Bank distribute 610 Daily Meals to Civic Workers Throughout Ramadan
  • SCM Gears Up for Ramadan with intensified inspection campaigns
  • Sharjah Municipality starts issuing permits for food outlets to display and sell in Ramadan daytime
  • Sharjah City Municipality and Alif Group Join Forces to Regulate Parking and Residences in Al Mamsha and Zero 6 mall
  • Sharjah Municipality Starts Evaluation Process for Best Garden Award Entrants
  • Sharjah Municipality showcases innovative projects during participation in UAE Innovation Month activities
  • Sharjah City Municipality: 300 Team Leaders, Supervisors, and 375 Support Staff Deployed to Effectively Deal with Unstable Weather Conditions
  • Sharjah Municipality launches 17th Edition of its Best Home Garden Award

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Request for Inspection report for the consultant scheme to match the reality of the under construction buildings
  • Service Description
    • Request for Inspection report for the consultant scheme to match the reality of the under construction buildings
  • Service Execution Steps
  • After Service Steps
    • ​- The municipality’s engineer calls the consultant to set an appointment.
      - After audit, the municipality’s engineer delivers the report at the site.​

       
  • Support Documents
  • Terms & Conditions
    • Print

      Requirements:

      - Project must be belonged to the user: consultant only.
      - Site under construction (no completion certificate issued for the project.)
      - Consultant’s valid license.
      - No outstanding violations on the consultant.
      - No outstanding violations on the plot.

       

      documents required during inspection:
      - Copy of plot plan
      - The consultant’s plans, sealed by the Building Control Section, to match them with the reality of buildings under construction.​
logo
Request for Inspection report for the consultant scheme to match the reality of the under construction buildings تقرير تفتيش على مخططات الاستشاري لمطابقتها بالواقع للمباني قيد الإنشاء
Terms and Conditions الشروط والأحكام

Requirements:

- Project must be belonged to the user: consultant only.
- Site under construction (no completion certificate issued for the project.)
- Consultant’s valid license.
- No outstanding violations on the consultant.
- No outstanding violations on the plot.

 

documents required during inspection:
- Copy of plot plan
- The consultant’s plans, sealed by the Building Control Section, to match them with the reality of buildings under construction.​

الاشتراطات:

- المشروع عائد للمستخدم : الاستشاري فقط.
- موقع قيد الانشاء (لا يوجد شهادة انجاز للمشروع)
- رخصة الاستشارى سارية المفعول
- لا يوجد مخالفات على رخصة الاستشاري
- عدم وجود مخالفات على قطعة الارض
 
الوثائق المطلوبة بالموقع اثناء التفتيش:
- صورة خارطة الارض. 
- مخططات الاستشاري لمطابقتها بالواقع للمباني قيد الانشــاء  عليها ختم قسم الرقابة على المباني.​

​​​