News Updates
  • SCM Conducts 12,000 Food Establishment Inspections, Closes Two Warehouses for Violations
  • Sharjah City Municipal Council and Municipality Welcome Chinese Delegation to Strengthen Cooperation and Exchange Expertise
  • Sharjah Municipality Launches Online Sewerage Information Request Service
  • Sharjah Municipal Council and Municipality Honour Former Rental Disputes Committee Members
  • Committee on Agricultural Violations Intensifies Oversight to Ensure Proper Use of Farms
  • l Dhaid Municipality to Introduce Paid Public Parking from January 1, 2025, in Collaboration with Sharjah Municipality
  • SCM Explores Latest Advances in Animal Disease Studies and Technologies at Veterinary Epidemiology and Economics Conference
  • Sharjah Municipality Awarded National Standard Certificate for Business Continuity Management System
  • Sharjah Municipality Launches the First-of-its-Kind Smart Testing System in the UAE at GITEX
  • Sharjah Municipality Announces Extension of Paid Parking Hours to Midnight in Certain Areas

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Request for engineering work Exemption
  • Service Description
    • A service provided to individuals and the business sector through which a specialized committee is formed to reconsider the submitted spaces of a design for the proposed or existing buildings.
  • Service Execution Steps

  • After Service Steps
    • Required Documents
      Individuals

      A copy of affection plan approved by the Planning and Survey Department (valid), Planning statement by the Planning and Survey Department (Valid statement), The proposed drawings and the exceptions required on it (clarify the exceptions), Letter from the Consultant office (Clarifying the reason behind the request submission) The previous approvals and exceptions (If available), Approved drawings from Town Planning and Survey department (In the case that the project is in the process of getting approved at the Initial Audit committee) , Old Approved drawings (if available), Inspection report about the condition of the site in the case that the building is existing or under construction (Valid report), Receipt of payment of request fees, Elevator study (In the case of decreasing the number of elevators)

      Businesses

      A copy of affection plan approved by the Planning and Survey Department (valid), Planning statement by the Planning and Survey Department (Valid statement), The proposed drawings and the exceptions required on it (clarify the exceptions), Letter from the Consultant office (Clarifying the reason behind the request submission) The previous approvals and exceptions (If available), Approved drawings from Town Planning and Survey department (In the case that the project is in the process of getting approved at the Initial Audit committee) , Old Approved drawings (if available), Inspection report about the condition of the site in the case that the building is existing or under construction (Valid report), Receipt of payment of request fees, Elevator study (In the case of decreasing the number of elevators)
  • Support Documents
  • Terms & Conditions
logo
Request for engineering work Exemption طلب التماس خاص بالأعمال الهندسية
Terms and Conditions الشروط والأحكام



​​​​