News Updates
  • Sharjah Municipality Launches Online Sewerage Information Request Service
  • Sharjah Municipal Council and Municipality Honour Former Rental Disputes Committee Members
  • Committee on Agricultural Violations Intensifies Oversight to Ensure Proper Use of Farms
  • l Dhaid Municipality to Introduce Paid Public Parking from January 1, 2025, in Collaboration with Sharjah Municipality
  • SCM Explores Latest Advances in Animal Disease Studies and Technologies at Veterinary Epidemiology and Economics Conference
  • Sharjah Municipality Awarded National Standard Certificate for Business Continuity Management System
  • Sharjah Municipality Launches the First-of-its-Kind Smart Testing System in the UAE at GITEX
  • Sharjah Municipality Announces Extension of Paid Parking Hours to Midnight in Certain Areas
  • Sharjah Municipality Wins Best Project Award at Sharjah Government Pavilion in GITEX
  • Sharjah Municipality Launches Two Key Projects to Provide Irrigation Water for Agricultural Initiatives

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Request to issue a building completion certificate
  • Service Description
    • A service that allows local and federal entities, the business sector, and individuals to request the issuance of a completion certificate for a residential, commercial, or industrial building.
  • Service Execution Steps
    • Municipality website under "Engineering and Building Control Services."
      Customer Service Desk at the Engineering and Building Control Department, Al Nasiriyah.
      Service Procedures:
      - Complete the "Final Handover Request" form with signatures from the owner, consultant, and contractor, along with the consultant's and contractor's stamps.
      - Attach all required documents as outlined in the Final Handover Request form.
      - Pay the site inspection and certificate issuance fees.
      - Confirm acceptance of the terms and conditions.


  • After Service Steps

    • Following submission, a municipal engineer will review the documents. If no issues or deficiencies are found, the applicant will be contacted to schedule the site inspection and finalize the report.​


  • Support Documents
      • Request Final Receipt
  • Terms & Conditions
    • Print

      Required Attachments:
      1. Final Handover Request Form.
      2. Copy of the previous Completion Certificate (for building additions).
      3. Electrical Inspection Certificate from Sharjah Electricity, Water, and Gas Authority (SEWA).
      4. Civil Defense Completion Certificate or "Hassantuk" compliance certificate.
      5. Water Inspection Certificate from SEWA.
      6. Gas Inspection Certificate from SEWA.
      7. Telecommunications Certificate.
      8. NOC from the Sewerage Department.
      9. NOC from Sharjah RTA.
      10. Property numbering notification and receipt.
      11. Warranty Schedule.
      12. Awqaf letter (for mosques).
      13. Supervision Entity letter (for government projects).
      14. Lift safety and inspection report from a third party (if applicable).
      15. Developer's approval (if the project is under their ownership).
      16. Municipal Council letter (if the contractor or consultant's signature and stamp are unavailable).
      17. Building naming approval from the Rental Regulation Department.
      General Requirements:
      - The plot must be clear of any violations.
      - The project must be registered under the user (consultant or contractor).
      - The construction purpose must be residential, agricultural, industrial, or commercial.
      - The completed project must match the approved description in the building permit.
      - The project must be active, with no suspensions or outstanding issues.
      - The site must be clean and free from construction debris.
      Requirements for Sites Under Construction:
      - No pending transactions related to the project.
      - Compliance of the site with approved plans.
      - Confirmation of completion of the following tasks:
      o Installation of internal stair railings and external balcony barriers.
      o Installation of external doors and windows.
      o Application of the final layer of exterior cladding.
      o Application of the initial layer of interior paint.
      o Completion of fence construction and gate installation.
      o Removal of temporary structures.
      o Completion of all external finishing works.
      o Ensuring the site is free from safety concerns, such as unsecured windows, stair railings, balcony barriers, and similar elements.

      For assistance or inquiries, contact the Engineering and Building Control Department at: 06516020

      Requirements for Issuing a Site Cleanliness Certificate
      (Health Control and Safety Department – Waste Control and Regulation Section)
      General Requirements:
      Remove the fence (corrugated sheets) surrounding the construction site.
      Remove the project signboard.
      Clear all construction debris from the site.
      Remove the temporary electrical panel.
      Remove any construction equipment, such as caravans, portable restrooms, scaffolding, etc.
      Documents Required for Villa Cleanliness Certificate:
      1. Building permit.
      2. Land plot plan.
      3. Final handover report from the supervising engineer.
      4. Interior and exterior site photographs.
      5. Trade license.
      6. Contact number.
      Documents Required for Cleanliness Certificate (Building, Industrial or Commercial Site):
      1. Building permit.
      2. Land plot plan.
      3. Final handover report from the supervising engineer.
      4. For industrial and commercial sites: Contract with waste collection and transport companies. For buildings: Receipt for waste bin purchase.
      5. Site photographs.
      6. Trade license.
      7. Contact number.
      8. Waste disposal receipt.

      Submission Instructions:
      Send all required documents in PDF format via email to:
      almustafa@shjmun.gov.ae / hcs@shjmun.gov.ae​


logo
Request to issue a building completion certificate طلب إصدار شهادة إنجاز مبنى
Terms and Conditions الشروط والأحكام

Required Attachments:
1. Final Handover Request Form.
2. Copy of the previous Completion Certificate (for building additions).
3. Electrical Inspection Certificate from Sharjah Electricity, Water, and Gas Authority (SEWA).
4. Civil Defense Completion Certificate or "Hassantuk" compliance certificate.
5. Water Inspection Certificate from SEWA.
6. Gas Inspection Certificate from SEWA.
7. Telecommunications Certificate.
8. NOC from the Sewerage Department.
9. NOC from Sharjah RTA.
10. Property numbering notification and receipt.
11. Warranty Schedule.
12. Awqaf letter (for mosques).
13. Supervision Entity letter (for government projects).
14. Lift safety and inspection report from a third party (if applicable).
15. Developer's approval (if the project is under their ownership).
16. Municipal Council letter (if the contractor or consultant's signature and stamp are unavailable).
17. Building naming approval from the Rental Regulation Department.
General Requirements:
- The plot must be clear of any violations.
- The project must be registered under the user (consultant or contractor).
- The construction purpose must be residential, agricultural, industrial, or commercial.
- The completed project must match the approved description in the building permit.
- The project must be active, with no suspensions or outstanding issues.
- The site must be clean and free from construction debris.
Requirements for Sites Under Construction:
- No pending transactions related to the project.
- Compliance of the site with approved plans.
- Confirmation of completion of the following tasks:
o Installation of internal stair railings and external balcony barriers.
o Installation of external doors and windows.
o Application of the final layer of exterior cladding.
o Application of the initial layer of interior paint.
o Completion of fence construction and gate installation.
o Removal of temporary structures.
o Completion of all external finishing works.
o Ensuring the site is free from safety concerns, such as unsecured windows, stair railings, balcony barriers, and similar elements.

For assistance or inquiries, contact the Engineering and Building Control Department at: 06516020

Requirements for Issuing a Site Cleanliness Certificate
(Health Control and Safety Department – Waste Control and Regulation Section)
General Requirements:
Remove the fence (corrugated sheets) surrounding the construction site.
Remove the project signboard.
Clear all construction debris from the site.
Remove the temporary electrical panel.
Remove any construction equipment, such as caravans, portable restrooms, scaffolding, etc.
Documents Required for Villa Cleanliness Certificate:
1. Building permit.
2. Land plot plan.
3. Final handover report from the supervising engineer.
4. Interior and exterior site photographs.
5. Trade license.
6. Contact number.
Documents Required for Cleanliness Certificate (Building, Industrial or Commercial Site):
1. Building permit.
2. Land plot plan.
3. Final handover report from the supervising engineer.
4. For industrial and commercial sites: Contract with waste collection and transport companies. For buildings: Receipt for waste bin purchase.
5. Site photographs.
6. Trade license.
7. Contact number.
8. Waste disposal receipt.

Submission Instructions:
Send all required documents in PDF format via email to:
almustafa@shjmun.gov.ae / hcs@shjmun.gov.ae​



المرفقات المطلوبة:
1. نموذج طلب الاستلام النهائي.
2. نسخة من شهادة الإنجاز السابقة (لإضافات البناء).
3. شهادة فحص الكهرباء من هيئة كهرباء ومياه وغاز الشارقة.
4. شهادة إنجاز أو استيفاء الدفاع المدني أو "حصنتك".
5. شهادة فحص المياه من هيئة كهرباء ومياه وغاز الشارقة.
6. شهادة فحص الغاز من هيئة كهرباء ومياه وغاز الشارقة.
7. شهادة الاتصالات.
8. عدم ممانعة من قسم المجاري.
9. عدم ممانعة من هيئة الطرق والمواصلات.
10. إشعار وإيصال الترقيم العقاري.
11. جدول الضمانات.
12. رسالة الأوقاف (للمساجد).
13. رسالة جهة الإشراف (للمشاريع الحكومية).
14. تقرير تفتيش واعتماد أمن وسلامة المصاعد من طرف ثالث (إن وجد).
15. موافقة المطور (إن كان المشروع تابعًا للمطور).
16. رسالة المجلس البلدي (في حال عدم وجود توقيع وختم المقاول أو الاستشاري).
17. تصريح تسمية البنايات من إدارة التنظيم الإيجاري.

الاشتراطات العامة:
- عدم وجود مخالفات على قطعة الأرض.
- أن يكون المشروع عائدًا للمستخدم (الاستشاري أو المقاول).
- أن يكون غرض البناء سكنيًا، زراعيًا، صناعيًا، أو تجاريًا.
- مطابقة المشروع المنفذ لوصف المشروع المعتمد بإجازة البناء.
- أن يكون المشروع قائمًا وليس موقوفًا أو عليه ملاحظات.
- أن يكون الموقع نظيفًا وخاليًا من مخلفات أعمال البناء.

اشتراطات المواقع قيد الإنشاء:
- عدم وجود معاملة سابقة قيد الإجراء.
- مطابقة الموقع للمخططات المعتمدة.
- الإقرار بالانتهاء من الأعمال التالية:
o حاجز الدرج الداخلي والبلكونات الخارجية (الدرابزين).
o تركيب الأبواب الخارجية والنوافذ.
o الطبقة النهائية للكساء الخارجي.
o الطبقة الأولية للصبغ الداخلي.
o تشطيب الأسوار وتركيب بوابة السور.
o إزالة المباني المؤقتة.
o إنهاء أعمال التشطيبات الخارجية.
o التأكد من خلو الموقع من ملاحظات الأمن والسلامة (مثل النوافذ، حاجز الدرج، الشرفات، الدرابزين الداخلي، وغيرها).

للمساعدة أو الاستفسار: يرجى التواصل مع إدارة الهندسة ورقابة المباني على: 06516020


الاشتراطات المطلوبة لاستخراج شهادة نظافة موقع
(إدارة الرقابة والسلامة الصحية – قسم رقابة وتنظيم النفايات)

الاشتراطات العامة:
- إزالة السياج المحيط بالبناء (الشينكو).
- إزالة لوحة المشروع.
- تنظيف الموقع من جميع مخلفات البناء.
- إزالة لوحة الكهرباء المؤقتة.
- إزالة أي معدات إنشائية من الموقع (الكرفانات، الحمامات المؤقتة، السقالات، إلخ).

المستندات المطلوبة لاستخراج شهادة نظافة فيلا:
1. إجازة البناء.
2. خارطة الأرض.
3. تقرير مهندس الاستلام النهائي.
4. صور للموقع من الداخل والخارج.
5. الرخصة التجارية.
6. رقم للتواصل.

المستندات المطلوبة لاستخراج شهادة نظافة (بناية أو موقع صناعي أو تجاري):
1. إجازة البناء.
2. خارطة الأرض.
3. تقرير مهندس الاستلام النهائي.
4. عقد مع شركات جمع ونقل النفايات (للمواقع الصناعية والتجارية)، وبالنسبة للبنايات يتم تقديم إيصال شراء الحاويات.
5. صور للموقع.
6. الرخصة التجارية.
7. رقم للتواصل.
8. إيصال التخلص من النفايات.

طريقة تقديم المستندات:
تُرسل جميع المستندات المطلوبة بصيغة PDF بالبريد الإلكتروني على:
 almustafa@shjmun.gov.ae / hcs@shjmun.gov.ae




​​​​