News Updates
  • Al Nouf 3 Park opened on 44,000 SqM in Sharjah
  • SCM opens Al Qarayen 2 Park over 70,085 sqm
  • SCM launches organic fertilizer production unit in conjunction with UAE Innovation Month
  • Sharjah Municipality opens Al Qarayen Park 4
  • SCM cracks down on authorised posters
  • 294k contracts attested last year in Sharjah city
  • SCM signs cooperation agreement with Sharjah Health Authority to bolster cooperation
  • 10 illegal behaviours to avoid on green spaces
  • 9 Health Requirements for Swimming Pools at Hotel establishments
  • SCM promotes lease contract attestation discount through various advertising media

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Request for renew the building permit of ordinary construction
  • Service Description
    • - Renewal of a normal building permit in residential areas after one year from its date of issue, and before the lapse of five years.
      - Renewal of a normal building permit in agricultural areas after six month from its date of issue, and before the lapse of three years.
  • Service Execution Steps
    •  
      - Filling out the required details.
      - Accepting the undertaking and provisions.
      - Payment of fees.
      - Electronic issuance of building permit.
       
      For more information about this request, please contact Engineering Department 06 5160 202
  • After Service Steps
    • - Transfer the case to the inspector in charge for the follow-up.

  • Support Documents
  • Terms & Conditions
    • Print

      Requirements:
      - Owner’s name shall not be changed.
      - Transaction shall be submitted by the Contractor.
      - Copy of a valid plot plan shall be attached.
      - Contractor’s license shall be valid.
      - No outstanding violations are registered against the Contractor.
      - No outstanding building violations at the site.

      documents required during inspection:
      1) Copy of a valid plot plan.
      2) NOC’s from the utility departments, in case the site is a vacant plot of land.
       
logo
Request for renew the building permit of ordinary construction تجديد اجازة البناء للبناء العادي
Terms and Conditions الشروط والأحكام

Requirements:
- Owner’s name shall not be changed.
- Transaction shall be submitted by the Contractor.
- Copy of a valid plot plan shall be attached.
- Contractor’s license shall be valid.
- No outstanding violations are registered against the Contractor.
- No outstanding building violations at the site.

documents required during inspection:
1) Copy of a valid plot plan.
2) NOC’s from the utility departments, in case the site is a vacant plot of land.
 
الاشتراطات:
- عدم تغيير اسم المالك.
- ادخال المعاملة عن طريق المقاول.
- صورة خارطة الارض سارية المفعول.
- رخصة المقاول سارية المفعول.
- لا يوجد مخالفات على المقاول.
- لا يوجد مخالفات بناء بالموقع.
 
الوثائق المطلوبة بالموقع اثناء التفتيش:
1) صورة خارطة الارض سارية المفعول .
2) شهادة عدم ممانعة من دوائر الخدمات (أصلية) فى حال قطعة الارض عبارة عن أرض فضاء.

​​​