News Updates
  • SCM signs MoU with Skyline University College to develop its human resources
  • SCM conducts 109,796 medical fitness examinations during first half of this year
  • SCM organizes campaign to remove unlicensed billboards
  • SCM conducts 8918 inspection visits to barbershops and beauty centres in 6 months
  • 6% increase in number of tenancy contracts in Sharjah city during first half of 2022 compared to same period last year
  • University of Melbourne delegation visits SCM labs
  • SCM launches campaign to remove unlicensed posters
  • SCM begins landscaping of Maliha Road phase 2 covering 7.8 km
  • 394 thousand tenancy contracts attested since beginning of last year
  • 7 new rescue posts installed on Al Khan and Al Mamzar beaches

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Request for Inspection report for the consultant scheme to match the reality of the under construction buildings
  • Service Description
    • Request for Inspection report for the consultant scheme to match the reality of the under construction buildings
  • Service Execution Steps
  • After Service Steps
    • ​- The municipality’s engineer calls the consultant to set an appointment.
      - After audit, the municipality’s engineer delivers the report at the site.​

       
  • Support Documents
  • Terms & Conditions
    • Print

      Requirements:

      - Project must be belonged to the user: consultant only.
      - Site under construction (no completion certificate issued for the project.)
      - Consultant’s valid license.
      - No outstanding violations on the consultant.
      - No outstanding violations on the plot.

       

      documents required during inspection:
      - Copy of plot plan
      - The consultant’s plans, sealed by the Building Control Section, to match them with the reality of buildings under construction.​
logo
Request for Inspection report for the consultant scheme to match the reality of the under construction buildings تقرير تفتيش على مخططات الاستشاري لمطابقتها بالواقع للمباني قيد الإنشاء
Terms and Conditions الشروط والأحكام

Requirements:

- Project must be belonged to the user: consultant only.
- Site under construction (no completion certificate issued for the project.)
- Consultant’s valid license.
- No outstanding violations on the consultant.
- No outstanding violations on the plot.

 

documents required during inspection:
- Copy of plot plan
- The consultant’s plans, sealed by the Building Control Section, to match them with the reality of buildings under construction.​

الاشتراطات:

- المشروع عائد للمستخدم : الاستشاري فقط.
- موقع قيد الانشاء (لا يوجد شهادة انجاز للمشروع)
- رخصة الاستشارى سارية المفعول
- لا يوجد مخالفات على رخصة الاستشاري
- عدم وجود مخالفات على قطعة الارض
 
الوثائق المطلوبة بالموقع اثناء التفتيش:
- صورة خارطة الارض. 
- مخططات الاستشاري لمطابقتها بالواقع للمباني قيد الانشــاء  عليها ختم قسم الرقابة على المباني.​

​​​