News Updates
  • Sharjah Municipal Council and Municipality Launch “Youth, Sustainable Future” Program to Support Youth
  • Sharjah Municipality Unveils Advanced Al-SAD 1500 Emergency Pumps to Enhance Emergency Preparedness
  • Sharjah Municipality Regulates City Centre Al Zahia Parking to Ensure a Smoother Visitor Experience Under New Cooperation Agreement
  • Sharjah Municipality Trains 23 Employees as Certified ISO Internal Auditors through Intensive Program
  • Sharjah Municipality Busts Arab Fraudster Selling Tank Water as Zamzam
  • SCM Conducts 12,000 Food Establishment Inspections, Closes Two Warehouses for Violations
  • Sharjah City Municipal Council and Municipality Welcome Chinese Delegation to Strengthen Cooperation and Exchange Expertise
  • Sharjah Municipality Launches Online Sewerage Information Request Service
  • Sharjah Municipal Council and Municipality Honour Former Rental Disputes Committee Members
  • Committee on Agricultural Violations Intensifies Oversight to Ensure Proper Use of Farms

Accessiblity

Resize Fonts

Use the buttons to Zoom IN and Zoom OUT

A+ A-

Accessibility Options

Use below button to switch the contrast.

Normal Colors
Invert Colors
Grayscale Color

Enable Access to

Click read button to listen the content of the website

Learn more

Please see here about enabling access

Services

Décor Works Completion Certificate
  • Service Description
    • A décor contractor submits a request to obtain a Décor Works Completion Certificate for shops in trading areas, and sheds in the industrial areas.
  • Service Execution Steps
    • ​1. Obtaining all required documents as stated in the service terms and conditions, and missing documents stated in the previous décor permit.
      2. Entering required details.
      3. Uploading the required documents as stated in the terms and conditions.
      4. Uploading the missing documents stated in the previous décor permit.
      5. Signing the undertaking and accepting the requirements.
      6. Paying the service fees.
      7. Issuing a Request To Appear card by the e-system.
      For help or enquiry, call the Engineering Department on: 065160202

  • After Service Steps
    •  

       
      ​1) The municipality inspector contacts the contractor by phone within two working days from submitting the e-transaction to fix an appointment for inspecting the leased unit.
      2) The contractor hands over all required original documents to the inspector at the site.
      3) After inspection, the transaction will be completed, and the contractor will be notified thereof via SMS.
      4) In case of transaction completion, the contractor may access the e-service page on the municipality’s website to print the certificate.
      5) In the event of notes, the Contractor shall review the desk of inspection and follow up department , after seven business days from the date of inspection, to complete the notes and the remaining documents (if any).
  • Support Documents
  • Terms & Conditions
    • Print

      Requirements:
      - A previous décor permit has been issued by the e-service.
      - The previous décor permit belongs to the same user.
      - No outstanding violations against the plot.
      - The décor works has been completed according to the issued permit.

      Documents required before e-transaction submission, and to be kept at the site:
      - Original letter from the contractor indicating the completion of works and receipt of dues.
      - Original letter from the tenant stating that the contractor has completed the décor works.
      - the missing documents mentioned in the previous décor:
      • Plan approved by SEWA (for divisions, mezzanine of sheds).
      • No objection certificate from the Natural Gas Department before commencing the works.
      • Grease trap installation certificate (restaurants and cafeterias).

logo
Décor Works Completion Certificate شهادة انهاء اعمال ديكور
Terms and Conditions الشروط والأحكام

Requirements:
- A previous décor permit has been issued by the e-service.
- The previous décor permit belongs to the same user.
- No outstanding violations against the plot.
- The décor works has been completed according to the issued permit.

Documents required before e-transaction submission, and to be kept at the site:
- Original letter from the contractor indicating the completion of works and receipt of dues.
- Original letter from the tenant stating that the contractor has completed the décor works.
- the missing documents mentioned in the previous décor:
• Plan approved by SEWA (for divisions, mezzanine of sheds).
• No objection certificate from the Natural Gas Department before commencing the works.
• Grease trap installation certificate (restaurants and cafeterias).

الاشتراطات:
- صدور تصريح ديكور سابق بواسطة الخدمة الالكترونية.
- تصريح الديكور السابق عائد لنفس المستخدم.
- لا يوجد مخالفات على قطعة الارض.
- انتهاء المقاول من اعمال الديكور حسب التصريح الصادر.

وثائق مطلوبة للحصول عليها قبل تقديم المعاملة الالكترونية:
- رسالة اصلية من المقاول بانهاء العمل و استلام المستحقات
- رسالة اصلية من المستاجر  باتمام المقاول  لاعمال الديكور
- فى حال ذكر وثائق ناقصة فى تصريح الديكور السابق:
• مخطط معتمد من من ادارة الكهرباء (فى حال التقسيمات و الميزانين بالشبرات)
• عدم ممانعة من ادارة الغاز الطبيعي قبل بدأ العمل
• شهادة تركيب مصيدة الشحوم (المطاعم - الكافتيريا)

​​​​